Baker P&P
Power

National Enrichment Facility

Project Overview

Our scope included building layout and dimensional control, excavation and backfill of footings, placement of Control Low Slump Material as backfill, procurement and installation of reinforcing materials, installation of anchor bolts and embeds (procured by others), procurement and installation of water-stop components, erection and dismantlement of gang wall formwork systems, hoisting and erection via Baker furnished tower crane, and placement of all concrete. Also included as a part of our scope was procurement and installation of the electrical systems, HVAC systems, compressed air system, nitrogen system, life safety systems (fire alarm, fire suppression, smoke detections) architectural systems, building envelope, and site utilities. The UBC storage pad which included crane foundations, crane rails, and storage slab was also performed by Baker.

All projects include:
Bunker
SBM 1001X
SBM 1003/1004
SBM 1005/1006
Multiple UBC Pads

This work was performed under NQA-1 standards. Baker provided QA/QC and Safety oversight and management.

Client:

URENCO USA

Location:

Eunice, NM

Size:

75,000 cy

Completion Date:

2015